ST4SEPR AL UIVIIIIIEJ
the Crusher Building was not used to process thoriated material. The Slag Storage Building, constructed circa 1964, was used for the storage of dross/slag residue materials prior to the second magnesium recovery step. The building was removed in 1977. Section 2.2 of the June 2001 DP will be updated
Get Details